Review checklist
Final client walkthrough, Unit A. Reviewed with the site lead on Aug 28, 2026.
Cabinet doors aligned and soft-close verified
All 14 doors and drawer fronts checked
Countertop seams sealed and level
Backsplash grout lines consistent, haze removed
Light haze remains near the range hood
Appliances installed, leveled, and registered
Shower glass free of scratches and hard-water spots
Tile edge trim finished at shower niche
Schluter strip on order, install expected Sep 02
Vanity plumbing checked, no leaks under load
Hardwood transitions flush at all doorways
Slight lip at the hallway threshold, needs sanding
Paint touch-ups complete on south wall
Fireplace surround stone cleaned and sealed
Thermostat programmed and heating cycle tested
Gutters clear, downspouts attached and draining away
Front door hardware keyed and deadbolt tested
Waiting on final keying from locksmith
Landscape lighting timer set for dusk to 11 pm